trail + bridge building--post yer picts!

Feb. 3, 2014, 9:07 p.m.
Posts: 18790
Joined: Oct. 28, 2003

Kidding ken. Please, for the love of cedar.

Feb. 3, 2014, 9:23 p.m.
Posts: 63
Joined: Aug. 6, 2004

Kidding ken. Please, for the love of cedar.

oh common! I was gonna do a multiple dazzy chain of em with a 360 swivel at the end. also a prince of persia style do or death ending.

Feb. 4, 2014, 9:15 p.m.
Posts: 690
Joined: Aug. 14, 2007

http://ca.youtube.com/watch?v=pH51rAX-G3o

Feb. 4, 2014, 9:24 p.m.
Posts: 18790
Joined: Oct. 28, 2003

nice! looks like you found the one blown down cedar on the mountain.

Feb. 5, 2014, 9:54 p.m.
Posts: 690
Joined: Aug. 14, 2007

Broke Wrist Bridge rebuild

http://ca.youtube.com/watch?v=pH51rAX-G3o

Feb. 5, 2014, 11:16 p.m.
Posts: 12194
Joined: Nov. 19, 2002

Great shots!^

Feb. 7, 2014, 9:54 p.m.
Posts: 690
Joined: Aug. 14, 2007

Repairing a bench cut, with a deadman, that had been sluffing into the ravine.

http://ca.youtube.com/watch?v=pH51rAX-G3o

Feb. 13, 2014, 9:44 p.m.
Posts: 2539
Joined: April 25, 2003

Nice to see some P.Pro being used out there. Remember kids, no matter how good you are with a saw things can go sideways real fast.

Nice work too!

April 14, 2014, 9:40 a.m.
Posts: 63
Joined: Aug. 6, 2004

Finding an easier way to haul a few hundred rungs to the work site.

Funny watching the riders looks when a dozen rungs scream 200 ft down a zip line then auto dump at the end, and the figure 8 setup self retrieve with no one in sight.

April 14, 2014, 5:23 p.m.
Posts: 1740
Joined: Dec. 31, 2006

Very creative silk, nice work.

There was this bridge on Roach Hit, great construction but unfortunately the supports were rotten. We used this opportunity to rebuild the feature in the new character of the trail.

Original bridge looking uphill:

The supports were thin and rotten, and needed replacement.

Out comes the main bridge. The stringers and rungs were structurally sound and were re-used after the bark was peeled off.

New supports were dug into the ground:

A little roller was built before the bridge, additional slats were put down, geomat and dirt holding logs installed.

Roller golded in.

Bridge golded too.

And a mellow run out to the bridge.

Should tie the trail together nicely!

April 15, 2014, 11:30 a.m.
Posts: 1740
Joined: Dec. 31, 2006

Little vid of a little feature. Building for the 90%.

http://www.pinkbike.com/video/358955/

April 15, 2014, 12:34 p.m.
Posts: 168
Joined: Dec. 30, 2004

^^^

nice work!!!

April 19, 2014, 6:30 p.m.
Posts: 47
Joined: Aug. 27, 2007

Found some pretty nice dirt today. Progress speeds up significantly when that happens


April 19, 2014, 7:13 p.m.
Posts: 18790
Joined: Oct. 28, 2003

watch out with lining the sides of your trail with logs - traps in the water and lets it run down the trail instead of off the side of it.

April 19, 2014, 7:14 p.m.
Posts: 160
Joined: Nov. 19, 2002

that looks choice!