New posts

Dale's Trail (lower) closed Saturday May 30th for trail day

May 28, 2015, 3:09 p.m.
Posts: 419
Joined: July 8, 2005

Norco John Henry Bikes is hosting a trail day on Dale's, this Saturday, May 30th.
The trail will be closed from about 9 am - 3 pm.
Cheers!

May 29, 2015, 10:25 p.m.
Posts: 333
Joined: Dec. 21, 2008

What time and where do we meet if we want to help out?

May 29, 2015, 10:59 p.m.
Posts: 0
Joined: April 19, 2012

saw something somewhere that said 9am at mushroom lot

May 29, 2015, 11:17 p.m.
Posts: 419
Joined: July 8, 2005

Yes, 9 am at the Mushroom lot, thanks!

June 1, 2015, 11:37 a.m.
Posts: 1774
Joined: July 11, 2014

So, who won that sweet sweet carbon Aurum frame? :)

June 9, 2015, 11:27 a.m.
Posts: 1026
Joined: June 26, 2012

How does the the work done on this trail day fit in with the machine built work being started by Metro Van today? What's the plan for the trail?

June 9, 2015, 11:46 a.m.
Posts: 419
Joined: July 8, 2005

How does the the work done on this trail day fit in with the machine built work being started by Metro Van today? What's the plan for the trail?

The trail day was on lower Dale's (primary work areas were just above the exit onto the power lines, and on the ride-around for the rock face. The main focus was water management (adding drainage, creating outslope, etc..). A summary and some pics are here: http://nsmba.ca/content/2015-06_dale%E2%80%99s-public-trail-day-may-30th

As far as I know, Metro will only be working on only the upper section. There was a fair bit of damage from very heavy rains this past winter. But what exactly Metro will do, I'm not sure, sorry.

To provide feedback and share your comments directly with Metro Vancouver, email: [email protected] and cc: [email protected]

Cheers,
Penny

June 9, 2015, 12:30 p.m.
Posts: 1026
Joined: June 26, 2012

The trail day was on lower Dale's (primary work areas were just above the exit onto the power lines, and on the ride-around for the rock face. The main focus was water management (adding drainage, creating outslope, etc..). A summary and some pics are here: http://nsmba.ca/content/2015-06_dale%E2%80%99s-public-trail-day-may-30th

As far as I know, Metro will only be working on only the upper section. There was a fair bit of damage from very heavy rains this past winter. But what exactly Metro will do, I'm not sure, sorry.

To provide feedback and share your comments directly with Metro Vancouver, email: [email protected] and cc: [email protected]

Cheers,
Penny

Thanks Penny. I sent my comments and questions.

Perhaps there are things going on I don't know about, but my impression is that Metro Van could be doing better on public consultation and transparency/communication with the public.

June 9, 2015, 1:01 p.m.
Posts: 160
Joined: Nov. 19, 2002

Perhaps there are things going on I don't know about, but my impression is that Metro Van could be doing better on public consultation and transparency/communication with the public.

they certainly could be, seems they really don't care though.

June 10, 2015, 7:25 a.m.
Posts: 642
Joined: June 8, 2005

Rode Dales last night. Great fun. The top section is a little rough but forces you to pick your line.

The lower sections was great. Haven't rode the lower section in a while, so not 100% certain on what work was done. The switchbacks as you get close to the power lines were very loose and silty from being dried out. As much fun as it would have been to slide around those corners with the back brake locked, I resisted and did my best not to lock up once and keep as much of the dirt on the trail.

Thanks to the who were out fixing the broken bits on the trail. The trails are so very good right now.

June 12, 2015, 3:30 p.m.
Posts: 1026
Joined: June 26, 2012

I got this reply from LSCR regarding the concerns I sent them:

"Thanks for taking the time to contact us.

In regards to your email, the NSMBA was notified of this work and a site visit took place to discuss all aspects of the project.

As you know, the LSCR is home to many kilometers of active mountain bike trails and we are exploring new options to assist with long term sustainability, environmental protection, and user enjoyment. This is a pilot project to determine the role machines may play in our trail network in the future.

Please do not hesitate to contact us again with any further questions or concerns.

Thank you."

Forum jump: