New posts

BP from Richard Juryn to Riverside Dr Metro Van work info

Oct. 22, 2015, 8:32 a.m.
Posts: 323
Joined: June 23, 2011

Metro Van will be starting work on the BP trail to make an easier two way access to Riverside Dr from Richard Juryn trail network.

Work will be ongoing from Oct 14th - Nov 14th.

This is to be built by Ewan Fafard so you know it will be good!

https://www.facebook.com/media/set/?set=oa.928098357226028[HTML_REMOVED]type=1

http://mtbtrails.ca/ Author of Locals' Guide to North Shore Rides and Locals' Guide to Fraser Valley Rides.

Follow us on Twitter and Instagram

Oct. 22, 2015, 11:23 a.m.
Posts: 272
Joined: May 11, 2005

This could be a good connector.

Would be even better if the residents on Riverside Drive didn't have the local government in their pockets and parking was allowed on Riverside Drive.

Oct. 22, 2015, 11:29 a.m.
Posts: 1359
Joined: May 4, 2006

I don't do Facebook so is there any other useful information on that link? Will the trail still be using the narrow bridge at the top of Riverside or is another bridge going in further upstream?

Forum jump: