"Deactivated"
FVMBA will try to get a map up shortly to clarify.
Deactivated trail. Reactivated logging road. Semantics!
"Deactivated"
FVMBA will try to get a map up shortly to clarify.
Deactivated trail. Reactivated logging road. Semantics!
Semantics; Schemiantics. tomorrow at 2:00.
Young guy shoveling on Heckle, please stop doing anymore work. Dirting existing stuff was fine but building new shitty jumps without permission, digging pits 5 feet from the trail, berming up sections that will make a fucking swimming pool when it rains shows me you dont know what you're doing. The last thing i wanna do is spend my time pulling out hokey shit from the trail, which is what I have to do now. Actually Id appreciate it if you'd remove anything new and fill the pits you dug.
Please not another shovel in the ground. Pretty sure you work at Caps in Maple Ridge, so if you see this good, if anyone here knows this chap please pass on the message. Thanks
diggin
noticed the bottom of upper Goldmine seems to be marked out for logging. Any info or timeline on this.:(
there is a sign at the main gate as well stating deactivation of the road starting June 1st
#northsidetrailbuilders
noticed the bottom of upper Goldmine seems to be marked out for logging. Any info or timeline on this.:(
Other than some trail closures during the actual logging and road building the trails should not be affected that much.
More logging at the Woodlot:
The upper portion of Stovetop is being re-activated as a logging road for future cutblocks in Woodlot W0086. The following trails will be affected:
Stovetop- Closed June 8 to June 30
B-Line- Closed June 8 to June 12
Upper Toadstool- Closed June 8 to June 12
Lower Toadstool- Closed June 8 to June 12
Blood Donor- Closed June 8 to June 12
Giant Killer- Closed June 8 to June 12
Logging and road building will occur from 7 am to 5 pm seven days a week. Please respect the closures and remain far away from any falling areas and equipment.
Note: schedule may be revised by the contractor. Signs will be posted at trailheads.
Thanks,
FVMBA
Wow! Never thought I'd see that day. Are they going down as far as Porkchops tiny drop?
Wow! Never thought I'd see that day. Are they going down as far as Porkchops tiny drop?
Pretty sure that is right in the middle of a future cut block.
You better hit it then. Test your new sic fiddy bee!
Pretty sure that is right in the middle of a future cut block.
along with every other trail at the woodlot, place is done. need to jump in the time machine to 2004.
Talked to the logging contractor today as he was finishing up. BLine the Toadstools, Giant Killer and Blood Donor are all open. You will probably have to get off your bike as there is some slash on Stovetop and watch for any equipment on the new road as it is being finished.
Was thinking of making the trip over from Vancouver tomorrow. How are the trail closures looking? Worth the trip?
Was thinking of making the trip over from Vancouver tomorrow. How are the trail closures looking? Worth the trip?
Yes. Everything is riding well except the very top of Stovetop and the Trans Canada Trail.
Yes. Everything is riding well except the very top of Stovetop and the Trans Canada Trail.
Great. Thanks for the update!
Forum jump: