Before I go off completely half-cocked, can anyone enlighten me why the new bridge over Kilmer Creek on the Baden Powell (on Fromme between Expresso and Pipeline) has no bike ramp on the east end like the old one did? Instead there is now only a steep set of stairs that are going to be very difficult (but possibly not impossible) to bike up.
Seriously though, this is a very strange decision. (I could use other terminology to describe this but I'm trying to be polite, at least until I have all the facts). The bridge looks as if it is done but maybe it is not yet done?? Can anyone who has the inside line on this enlighten me on why this happened or if future work is still planned before I go making a fool of myself by writing a bunch of emails and posting on social media.