" Currently, only six of the 104 major water crossings it has identified have valves within a kilometre of the banks on both sides, the regulator noted. I think this is a major setback for Enbridge, said Adam Scott, project manager with Toronto-based Environmental Defence, which had opposed the project. They clearly just figured they could get this thing rubber-stamped, and push through without actually improving the safety of the pipeline. So were happy to see the NEB has said no.
Industry wouldn't do anything wrong if we let them police themselves …would they?